Comparison among five evolutionary-based optimization algorithms
E Elbeltagi, T Hegazy, D Grierson
Advanced engineering informatics 19 (1), 43-53, 2005
18362005
Optimization of resource allocation and leveling using genetic algorithms
T Hegazy
Journal of construction engineering and management 125 (3), 167-175, 1999
6331999
Neural network model for parametric cost estimation of highway projects
T Hegazy, A Ayed
Journal of construction engineering and management 124 (3), 210-218, 1998
4981998
Optimization of construction time-cost trade-off analysis using genetic algorithms
T Hegazy
Canadian Journal of Civil Engineering 26 (6), 685-697, 1999
3231999
Neural networks as tools in construction
O Moselhi, T Hegazy, P Fazio
Journal of construction engineering and management 117 (4), 606-625, 1991
3091991
A modified shuffled frog-leaping optimization algorithm: applications to project management
E Elbeltagi, T Hegazy, D Grierson
Structure and Infrastructure Engineering 3 (1), 53-60, 2007
2872007
Developing practical neural network applications using back‐propagation
T Hegazy, P Fazio, O Moselhi
Computer‐Aided Civil and Infrastructure Engineering 9 (2), 145-159, 1994
2501994
Computer-based construction project management: Pearson new international edition
T Hegazy
Pearson Higher Ed, 2013
2472013
Dynamic layout of construction temporary facilities considering safety
E Elbeltagi, T Hegazy, A Eldosouky
Journal of construction engineering and management 130 (4), 534-541, 2004
2162004
EvoSite: Evolution-based model for site layout planning
T Hegazy, E Elbeltagi
Journal of computing in civil engineering 13 (3), 198-206, 1999
2131999
Cost optimization in projects with repetitive nonserial activities
T Hegazy, N Wassef
Journal of Construction Engineering and Management 127 (3), 183-191, 2001
2122001
Project performance control in reconstruction projects
R McKim, T Hegazy, M Attalla
Journal of construction engineering and management 126 (2), 137-141, 2000
2092000
Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression
M Attalla, T Hegazy
Journal of construction engineering and management 129 (4), 405-411, 2003
2002003
Comparison of two evolutionary algorithms for optimization of bridge deck repairs
H Elbehairy, E Elbeltagi, T Hegazy, K Soudki
Computer‐Aided Civil and Infrastructure Engineering 21 (8), 561-572, 2006
1822006
Resource optimization using combined simulation and genetic algorithms
T Hegazy, M Kassab
Journal of construction engineering and management 129 (6), 698-705, 2003
1752003
Improving design coordination for building projects. I: Information model
T Hegazy, E Zaneldin, D Grierson
Journal of Construction Engineering and Management 127 (4), 322-329, 2001
1492001
DBID: Analogy-based DSS for bidding in construction
O Moselhi, T Hegazy, P Fazio
Journal of Construction Engineering and Management 119 (3), 466-479, 1993
1461993
Analogy-based solution to markup estimation problem
T Hegazy, O Moselhi
Journal of Computing in Civil Engineering 8 (1), 72-87, 1994
1441994
Daily windows delay analysis
T Hegazy, K Zhang
Journal of construction engineering and management 131 (5), 505-512, 2005
1302005
Conflict resolution in construction disputes using the graph model
M Kassab, K Hipel, T Hegazy
Journal of construction engineering and management 132 (10), 1043-1052, 2006
1282006