Research validation: Challenges and opportunities in the construction domain G Lucko, EM Rojas Journal of Construction Engineering and Management 136 (1), 127-135, 2009 | 325 | 2009 |
Cranes for building construction projects A Shapira, G Lucko, CJ Schexnayder Journal of Construction Engineering and Management 133 (9), 690-700, 2007 | 122 | 2007 |
Productivity scheduling method: Linear schedule analysis with singularity functions G Lucko Journal of Construction Engineering and Management 135 (4), 246-253, 2009 | 78 | 2009 |
Productivity scheduling method compared to linear and repetitive project scheduling methods G Lucko Journal of Construction Engineering and Management 134 (9), 711-720, 2008 | 66 | 2008 |
Integrating efficient resource optimization and linear schedule analysis with singularity functions G Lucko Journal of Construction Engineering and Management 137 (1), 45-55, 2010 | 61 | 2010 |
Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions Y Su, G Lucko Automation in Construction 70, 38-50, 2016 | 60 | 2016 |
Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling G Lucko, TDCL Alves, VL Angelim Construction Management and Economics 32 (6), 575-594, 2014 | 57 | 2014 |
Float types in linear schedule analysis with singularity functions G Lucko, AA Peña Orozco Journal of Construction Engineering and Management 135 (5), 368-377, 2009 | 52 | 2009 |
A statistical analysis and model of the residual value of different types of heavy construction equipment G Lucko Virginia Tech, 2003 | 45 | 2003 |
Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing G Lucko Journal of Construction Engineering and Management 137 (7), 523-535, 2010 | 44 | 2010 |
Quantitative research: Preparation of incongruous economic data sets for archival data analysis G Lucko, ZW Mitchell Jr Journal of Construction Engineering and Management 136 (1), 49-57, 2009 | 40 | 2009 |
Statistical considerations for predicting residual value of heavy equipment G Lucko, CM Anderson-Cook, MC Vorster Journal of construction engineering and management 132 (7), 723-732, 2006 | 39 | 2006 |
Unknown element of owning costs—Impact of residual value G Lucko, MC Vorster, CM Anderson-Cook Journal of construction engineering and management 133 (1), 3-9, 2007 | 29 | 2007 |
Construction technology needs assessment update MC Vorster, G Lucko Construction Industry Institute, 173-11, 2002 | 29 | 2002 |
Harnessing the power of simulation in the project management/decision support aspects of the construction industry G Lucko, PC Benjamin, MG Madden 2008 Winter Simulation Conference, 2479-2487, 2008 | 28 | 2008 |
Flexible modeling of linear schedules for integrated mathematical analysis G Lucko Proceedings of the 39th conference on Winter simulation: 40 years! The best …, 2007 | 27 | 2007 |
Modeling the residual market value of construction equipment under changed economic conditions G Lucko Journal of construction engineering and management 137 (10), 806-816, 2010 | 26 | 2010 |
Comparison and renaissance of classic line-of-balance and linear schedule concepts for construction industry Y Su, G Lucko Procedia Engineering 123, 546-556, 2015 | 25 | 2015 |
Construction spatial modeling and scheduling with three-dimensional singularity functions G Lucko, HMM Said, A Bouferguene Automation in Construction 43, 132-143, 2014 | 24 | 2014 |
Supporting financial decision-making based on time value of money with singularity functions in cash flow models G Lucko Construction Management and Economics 31 (3), 238-253, 2013 | 24 | 2013 |