Follow
Siyuan Wang
Siyuan Wang
Argonne National Laboratory
Verified email at jhu.edu - Homepage
Title
Cited by
Cited by
Year
Robust co-planning of energy storage and transmission line with mixed integer recourse
S Wang, G Geng, Q Jiang
IEEE Transactions on Power Systems 34 (6), 4728-4738, 2019
782019
Joint planning of electricity transmission and hydrogen transportation networks
S Wang, R Bo
IEEE Transactions on Industry Applications 58 (2), 2887-2897, 2021
312021
Distributionally robust unit commitment with flexible generation resources considering renewable energy uncertainty
S Wang, C Zhao, L Fan, R Bo
IEEE Transactions on Power Systems 37 (6), 4179-4190, 2022
292022
Modeling state transition and head-dependent efficiency curve for pumped storage hydro in look-ahead dispatch
S Wang, J Liu, H Chen, R Bo, Y Chen
IEEE Transactions on Power Systems 36 (6), 5396-5407, 2021
182021
Economic dispatch for electricity merchant with energy storage and wind plant: State of charge based decision making considering market impact and uncertainties
J Liu, X Sun, R Bo, S Wang, M Ou
Journal of Energy Storage 53, 104816, 2022
152022
Operational bottleneck identification based energy storage investment requirement analysis for renewable energy integration
S Wang, G Geng, J Ma, Q Jiang, H Huang, B Lou
IEEE Transactions on Sustainable Energy 12 (1), 92-102, 2020
142020
Optimal configuration of energy storage considering wind ramping events
S Wang, Q Jiang, Y Ge
Power System Technology 42 (4), 1093-1100, 2017
14*2017
Optimal scheduling for profit maximization of energy storage merchants considering market impact based on dynamic programming
J Liu, R Bo, S Wang, H Chen
Computers & Industrial Engineering 155, 107212, 2021
122021
Developing robust bidding strategy for virtual bidders in day-ahead electricity markets
H Mehdipourpicha, S Wang, R Bo
IEEE Open Access Journal of Power and Energy 8, 329-340, 2021
112021
A resilience-oriented multi-stage adaptive distribution system planning considering multiple extreme weather events
S Wang, R Bo
IEEE Transactions on Sustainable Energy 14 (2), 1193-1204, 2023
62023
Optimal GenCo offering strategy with joint participation in FTR auction and day-ahead market considering virtual bidding
H Mehdipourpicha, R Bo, S Wang
IEEE Transactions on Power Systems 38 (3), 2247-2260, 2022
32022
Generation expansion planning considering discrete storage model and renewable energy uncertainty: A bi-interval optimization approach
S Wang, G Geng, Q Jiang, R Bo
IEEE Transactions on Industrial Informatics 19 (3), 2973-2983, 2022
32022
Approximating input-output curve of pumped storage hydro plant: A disjunctive convex hull method
S Wang, J Liu, R Bo, Y Chen
IEEE Transactions on Power Systems 38 (1), 63-74, 2022
32022
Managing reserve deliverability risk of integrated electricity‐heat systems in day‐ahead market: A distributionally robust joint chance constrained approach
Y Chen, J Wang, S Wang, R Bo, C Gu, Q Li
IET Generation, Transmission & Distribution 17 (15), 3449-3462, 2023
22023
Modeling and optimizing pumped storage in a multi-stage large scale electricity market under portfolio evolution
R Bo, Y Chen, L Wu, R Baldick, B Huang, A Ghesmati, S Wang, J Liu, ...
Final Technical Report, DOE Grant DE-EE0008781, 2021
22021
Joint bidding strategy in day-ahead electricity market and FTR auction market
H Mehdipourpicha, R Bo, S Wang
2020 12th IEEE PES Asia-Pacific Power and Energy Engineering Conference …, 2020
22020
Energy storage planning for large scale renewable energy integrated power systems
S Wang
Zhejiang University, 2019
2*2019
Impact of time-coupled generator formulation on energy storage sizing problem
S Wang, G Geng, W Liu, Q Jiang
2018 North American Power Symposium (NAPS), 1-6, 2018
22018
Coordinated operations of hydrogen and power distribution systems
M Li, S Wang, L Fan, Z Han
2023 IEEE PES Innovative Smart Grid Technologies Conference (ISGT), 1-5, 2023
12023
Multi-parametric analysis for mixed integer linear programming: An application to transmission planning and congestion control
J Liu, R Bo, S Wang
arXiv preprint arXiv:2207.09325, 2022
12022
The system can't perform the operation now. Try again later.
Articles 1–20