Follow
K J Kim
K J Kim
Verified email at cau.ac.kr
Title
Cited by
Cited by
Year
Preliminary cost estimation model using case-based reasoning and genetic algorithms
KJ Kim, K Kim
Journal of Computing in Civil Engineering 24 (6), 499-505, 2010
1352010
Multi-agent-based simulation system for construction operations with congested flows
K Kim, KJ Kim
Automation in Construction 19 (7), 867-874, 2010
692010
Interactive simulation modeling for heavy construction operations
KJ Kim, GE Gibson Jr
Automation in Construction 12 (1), 97-109, 2003
522003
Life cycle assessment based environmental impact estimation model for pre-stressed concrete beam bridge in the early design phase
KJ Kim, WG Yun, N Cho, J Ha
Environmental Impact Assessment Review 64, 47-56, 2017
342017
Approximate cost estimating model for PSC Beam bridge based on quantity of standard work
KJ Kim, K Kim, CS Kang
KSCE Journal of Civil Engineering 13, 377-388, 2009
282009
Development of wireless vibration sensor using MEMS for tunnel construction and maintenance
SW Kwon, JY Kim, HS Yoo, MY Cho, KJ Kim
Tunnelling and Underground Space Technology incorporating Trenchless …, 2006
202006
An analysis of the characteristics of environmental impact for PSC beam bridges using life cycle assessment
N Cho, WG Yun, WR Lee, KJ Kim
KSCE Journal of Civil and Environmental Engineering Research 36 (2), 297-305, 2016
142016
An approximate cost estimation model based on standard quantities of steel box girder bridge substructure
CD Oh, C Park, KJ Kim
KSCE Journal of Civil Engineering 17, 877-885, 2013
132013
Collaborative work model under distributed construction environments
KJ Kim, CK Lee, JR Kim, EY Shin, MY Cho
Canadian Journal of Civil Engineering 32 (2), 299-313, 2005
132005
Estimating approximate construction duration of CFRD in the planning stage
KJ Kim, WG Yun, IK Kim
KSCE Journal of Civil Engineering 20, 2604-2613, 2016
122016
Case study on the evaluation of equipment flow at a construction site
KJ Kim, K Kim
Journal of computing in civil engineering 24 (6), 570-575, 2010
122010
Environmental load estimating model of NATM tunnel based on standard quantity of major works in the early design phase
J Lee, KJ Kim, EW Kim, HR Kim
KSCE Journal of Civil Engineering 22, 1040-1051, 2018
112018
Analysis of environmental load by work classification for NATM tunnels
J Lee, JA Shim, KJ Kim
KSCE Journal of Civil and Environmental Engineering Research 36 (2), 307-315, 2016
102016
Evaluation of environmental economics on dismantling projects using LCI DB
SH Kwon, KJ Kim, BS Kim, SB Kim
Proceedings of the Korean Institute Of Construction Engineering and …, 2008
102008
Improvement for asset management of sewage treatment facilities
HJ Park, MS An, NH Cho, KJ Kim
KSCE Journal of Civil and Environmental Engineering Research 31 (2D), 285-293, 2011
82011
Assessment model on environmental economics for construction projects in Korea
SH Kwon, KJ Kim, K Kim, N Cho
KSCE Journal of Civil Engineering 16, 505-516, 2012
72012
Valuation on the Intangible Benefits of EVMS using CVM
KJ Kim, K Kim, KY Kang
Journal of Asian Architecture and Building Engineering 9 (1), 221-228, 2010
72010
A study on advance rate under the operating conditions of EPB shield TBM based on TBM operation data
MS An, KS Lim, KJ Kim
KSCE Journal of Civil and Environmental Engineering Research 31 (6D), 839-848, 2011
62011
The value assessment for indirect benefits of road project using contingent valuation method
KJ Kim, KY Kang, K Kim
KSCE Journal of Civil and Environmental Engineering Research 30 (1D), 61-70, 2010
62010
Simplified discrete event simulation for heavy construction operations
KJ Kim
The University of Texas at Austin, 1997
61997
The system can't perform the operation now. Try again later.
Articles 1–20