Follow
Ebrahim Farrokh
Title
Cited by
Cited by
Year
Study of various models for estimation of penetration rate of hard rock TBMs
E Farrokh, J Rostami, C Laughton
Tunnelling and Underground Space Technology 30, 110-123, 2012
2172012
Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance project
E Farrokh, J Rostami
Tunnelling and Underground Space Technology 24 (4), 436-446, 2009
1182009
Correlation of tunnel convergence with TBM operational parameters and chip size in the Ghomroud tunnel, Iran
E Farrokh, J Rostami
Tunnelling and Underground Space Technology 23 (6), 700-710, 2008
942008
Evaluation of ground convergence and squeezing potential in the TBM driven Ghomroud tunnel project
E Farrokh, A Mortazavi, G Shamsi
Tunnelling and Underground Space Technology 21 (5), 504-510, 2006
752006
A discussion on hard rock TBM cutter wear and cutterhead intervention interval length evaluation
E Farrokh, DY Kim
Tunnelling and Underground Space Technology 81, 336-357, 2018
652018
Study of utilization factor and advance rate of hard rock TBMs
E Farrokh
452013
Analysis of unit supporting time and support installation time for open TBMs
E Farrokh, J Rostami, C Laughton
Rock mechanics and rock engineering 44, 431-445, 2011
332011
A study of various models used in the estimation of advance rates for hard rock TBMs
E Farrokh
Tunnelling and Underground Space Technology 97, 103219, 2020
252020
Advance rate simulation for hard rock TBMs
J Rostami, E Farrokh, C Laughton, SS Eslambolchi
KSCE Journal of civil engineering 18, 837-852, 2014
212014
Cutter change time and cutter consumption for rock TBMs
E Farrokh
Tunnelling and Underground Space Technology 114, 104000, 2021
192021
Maximum surface settlement prediction in EPB TBM tunneling using soft computing techniques
H Samadi, J Hassanpour, E Farrokh
Journal of Physics: Conference Series 1973 (1), 012195, 2021
112021
Primary and secondary tools’ life evaluation for soft ground TBMs
E Farrokh
Bulletin of Engineering Geology and the Environment 80, 4909-4927, 2021
112021
The relationship between tunnel convergence and TBM operational parameters and chip size for double shield TBMs
E Farrokh, J Rostami
RETC, Canada, 1094-1108, 2007
102007
Introducing hard rock TBMs’ downtime analysis model with reference to past case histories’ data
E Farrokh
Journal of Mining and Environment 9 (2), 457-472, 2018
82018
Rotary cutting test for hard-rock TBM performance evaluation
E Farrokh, DY Kim, SB Kyung
World tunneling conference, Dubrovnik, Croatia, May, 22-28, 2015
72015
A discussion on TBM cutter change time and cutter life
E Farrokh, J Rostami, OG Askilsrud
SME Annual Meeting, Denver, 13-105, 2013
72013
Uniformly distributed lace design for hard rock TBMs
E Farrokh
Tunnelling and Underground Space Technology 110, 103829, 2021
62021
Optimum design of the peripheral cutters’ specification on the head profile for hard-rock TBMs
E Farrokh
Tunnelling and Underground Space Technology 107, 103668, 2021
62021
Layout design specifications of hard-rock TBM cutterheads at maximum cutter penetration and TBM advance
E Farrokh
Arabian Journal of Geosciences 14 (19), 2049, 2021
52021
Utilization of rock mass parameters for performance prediction of rock TBMs using machine learning algorithms
H Samadi, E Farrokh
4th international conference on development of materials engineering …, 2021
52021
The system can't perform the operation now. Try again later.
Articles 1–20