Study of various models for estimation of penetration rate of hard rock TBMs E Farrokh, J Rostami, C Laughton Tunnelling and Underground Space Technology 30, 110-123, 2012 | 217 | 2012 |
Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance project E Farrokh, J Rostami Tunnelling and Underground Space Technology 24 (4), 436-446, 2009 | 118 | 2009 |
Correlation of tunnel convergence with TBM operational parameters and chip size in the Ghomroud tunnel, Iran E Farrokh, J Rostami Tunnelling and Underground Space Technology 23 (6), 700-710, 2008 | 94 | 2008 |
Evaluation of ground convergence and squeezing potential in the TBM driven Ghomroud tunnel project E Farrokh, A Mortazavi, G Shamsi Tunnelling and Underground Space Technology 21 (5), 504-510, 2006 | 75 | 2006 |
A discussion on hard rock TBM cutter wear and cutterhead intervention interval length evaluation E Farrokh, DY Kim Tunnelling and Underground Space Technology 81, 336-357, 2018 | 65 | 2018 |
Study of utilization factor and advance rate of hard rock TBMs E Farrokh | 45 | 2013 |
Analysis of unit supporting time and support installation time for open TBMs E Farrokh, J Rostami, C Laughton Rock mechanics and rock engineering 44, 431-445, 2011 | 33 | 2011 |
A study of various models used in the estimation of advance rates for hard rock TBMs E Farrokh Tunnelling and Underground Space Technology 97, 103219, 2020 | 25 | 2020 |
Advance rate simulation for hard rock TBMs J Rostami, E Farrokh, C Laughton, SS Eslambolchi KSCE Journal of civil engineering 18, 837-852, 2014 | 21 | 2014 |
Cutter change time and cutter consumption for rock TBMs E Farrokh Tunnelling and Underground Space Technology 114, 104000, 2021 | 19 | 2021 |
Maximum surface settlement prediction in EPB TBM tunneling using soft computing techniques H Samadi, J Hassanpour, E Farrokh Journal of Physics: Conference Series 1973 (1), 012195, 2021 | 11 | 2021 |
Primary and secondary tools’ life evaluation for soft ground TBMs E Farrokh Bulletin of Engineering Geology and the Environment 80, 4909-4927, 2021 | 11 | 2021 |
The relationship between tunnel convergence and TBM operational parameters and chip size for double shield TBMs E Farrokh, J Rostami RETC, Canada, 1094-1108, 2007 | 10 | 2007 |
Introducing hard rock TBMs’ downtime analysis model with reference to past case histories’ data E Farrokh Journal of Mining and Environment 9 (2), 457-472, 2018 | 8 | 2018 |
Rotary cutting test for hard-rock TBM performance evaluation E Farrokh, DY Kim, SB Kyung World tunneling conference, Dubrovnik, Croatia, May, 22-28, 2015 | 7 | 2015 |
A discussion on TBM cutter change time and cutter life E Farrokh, J Rostami, OG Askilsrud SME Annual Meeting, Denver, 13-105, 2013 | 7 | 2013 |
Uniformly distributed lace design for hard rock TBMs E Farrokh Tunnelling and Underground Space Technology 110, 103829, 2021 | 6 | 2021 |
Optimum design of the peripheral cutters’ specification on the head profile for hard-rock TBMs E Farrokh Tunnelling and Underground Space Technology 107, 103668, 2021 | 6 | 2021 |
Layout design specifications of hard-rock TBM cutterheads at maximum cutter penetration and TBM advance E Farrokh Arabian Journal of Geosciences 14 (19), 2049, 2021 | 5 | 2021 |
Utilization of rock mass parameters for performance prediction of rock TBMs using machine learning algorithms H Samadi, E Farrokh 4th international conference on development of materials engineering …, 2021 | 5 | 2021 |