Follow
Saber Molla-Alizadeh-Zavardehi
Saber Molla-Alizadeh-Zavardehi
Assistant Professor of Industrial Engineering, Islamic Azad University
No verified email
Title
Cited by
Cited by
Year
Solving a capacitated fixed-charge transportation problem by artificial immune and genetic algorithms with a Prüfer number representation
S Molla-Alizadeh-Zavardehi, M Hajiaghaei-Keshteli, ...
Expert Systems with Applications 38 (8), 10462-10474, 2011
1122011
Evaluation of sustainable supply chain management performance: Indicators
O Narimissa, A Kangarani‐Farahani, S Molla‐Alizadeh‐Zavardehi
Sustainable Development 28 (1), 118-131, 2020
982020
Addressing a nonlinear fixed-charge transportation problem using a spanning tree-based genetic algorithm
M Hajiaghaei-Keshteli, S Molla-Alizadeh-Zavardehi, ...
Computers & Industrial Engineering 59 (2), 259-271, 2010
982010
Genetic algorithms for coordinated scheduling of production and air transportation
MR Delavar, M Hajiaghaei-Keshteli, S Molla-Alizadeh-Zavardehi
Expert Systems with Applications 37 (12), 8255-8266, 2010
752010
Solving a fuzzy fixed charge solid transportation problem by metaheuristics
S Molla-Alizadeh-Zavardehi, SS Nezhad, R Tavakkoli-Moghaddam, ...
Mathematical and computer modelling 57 (5-6), 1543-1558, 2013
692013
A constrained portfolio selection model at considering risk-adjusted measure by using hybrid meta-heuristic algorithms
IB Salehpoor, S Molla-Alizadeh-Zavardehi
Applied Soft Computing 75, 233-253, 2019
522019
Drivers and barriers for implementation and improvement of Sustainable Supply Chain Management
O Narimissa, A Kangarani‐Farahani, S Molla‐Alizadeh‐Zavardehi
Sustainable Development 28 (1), 247-258, 2020
472020
Evaluation of sustainable supply chain management performance: Dimensions and aspects
O Narimissa, A Kangarani‐Farahani, S Molla‐Alizadeh‐Zavardehi
Sustainable Development, 1-12, 2019
43*2019
Synchronizing production and air transportation scheduling using mathematical programming models
M Zandieh, S Molla-Alizadeh-Zavardehi
Journal of computational and Applied mathematics 230 (2), 546-558, 2009
302009
Genetic and differential evolution algorithms for the allocation of customers to potential distribution centers in a fuzzy environment
A Mahmoodi-Rad, S Molla-Alizadeh-Zavardehi, R Dehghan, M Sanei, ...
The International Journal of Advanced Manufacturing Technology 70, 1939-1954, 2014
262014
Hybrid greedy algorithms for fuzzy tardiness/earliness minimisation in a special single machine scheduling problem: case study and generalisation
S Niroomand, A Hadi-Vencheh, N Mirzaei, S Molla-Alizadeh-Zavardehi
International Journal of Computer Integrated Manufacturing 29 (8), 870-888, 2016
252016
Mathematical formulation and hybrid meta-heuristic solution approaches for dynamic single row facility layout problem
R Şahin, S Niroomand, ED Durmaz, S Molla-Alizadeh-Zavardehi
Annals of Operations Research 295 (1), 313-336, 2020
232020
Adaptive meta-heuristic algorithms for flexible supply chain network design problem with different delivery modes
A Shoja, S Molla-Alizadeh-Zavardehi, S Niroomand
Computers & Industrial Engineering 138, 106107, 2019
232019
Step fixed charge transportation problems via genetic algorithm
S Molla-Alizadeh-Zavardehi, A Mahmoodirad, M Rahimian
Indian Journal of Science and Technology, 949-954, 2014
222014
Hybrid adaptive simplified human learning optimization algorithms for supply chain network design problem with possibility of direct shipment
A Shoja, S Molla-Alizadeh-Zavardehi, S Niroomand
Applied soft computing 96, 106594, 2020
182020
Meta-heuristic approaches for fixed-charge solid transportation problem in two-stage supply chain network
M Akbari, S Molla-Alizadeh-Zavardehi, S Niroomand
Operational Research, 1-25, 2019
182019
Modified metaheuristic algorithms to design a closed-loop supply chain network considering quantity discount and fixed-charge transportation
G Chaharmahali, D Ghandalipour, M Jasemi, S Molla-Alizadeh-Zavardehi
Expert Systems with Applications 202, 117364, 2022
162022
A modified imperialist competitive algorithm for scheduling single batch-processing machine with fuzzy due date
S Molla-Alizadeh-Zavardehi, R Tavakkoli-Moghaddam, FH Lotfi
The International Journal of Advanced Manufacturing Technology 85, 2439-2458, 2016
152016
Synchronized production and distribution scheduling with due window
M Zandieh, S Molla-Alizadeh-Zavardehi
Journal of Applied Sciences 8 (15), 2752-2757, 2008
142008
An Electromagnetism-like algorithm for fixed charge solid transportation problem
M Sanei, A Mahmoodirad, S Molla-Alizadeh-Zavardehi
International Journal of Mathematical Modelling & Computations 3, 345–354, 2013
13*2013
The system can't perform the operation now. Try again later.
Articles 1–20