Follow
Chang Wook Kang
Chang Wook Kang
한양대학교 산업경영공학과 교수
Verified email at hanyang.ac.kr
Title
Cited by
Cited by
Year
The changepoint model for statistical process control
DM Hawkins, P Qiu, CW Kang
Journal of quality technology 35 (4), 355-366, 2003
5032003
Analysing the organizational factors of project complexity using structural equation modelling
SM Qureshi, CW Kang
International journal of project management 33 (1), 165-176, 2015
2872015
A control chart for the coefficient of variation
CW Kang, MS Lee, YJ Seong, DM Hawkins
Journal of quality technology 39 (2), 151-158, 2007
1882007
A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem
JY Kim, CW Kang, IK Hwang
International Journal of Project Management 30 (2), 264-272, 2012
1872012
Development of CV control chart using EWMA technique
EP Hong, CW Kang, JW Baek, HW Kang
Journal of the society of Korea Industrial and Systems Engineering 31 (4 …, 2008
942008
Cell formation in a cellular manufacturing system using simulation integrated hybrid genetic algorithm
M Imran, C Kang, YH Lee, M Jahanzaib, H Aziz
Computers & Industrial Engineering 105, 123-135, 2017
842017
Effect of inspection performance in smart manufacturing system based on human quality control system
CW Kang, MB Ramzan, B Sarkar, M Imran
The International Journal of Advanced Manufacturing Technology 94, 4351-4364, 2018
692018
Medicine supply chain model for an integrated healthcare system with uncertain product complaints
M Imran, C Kang, MB Ramzan
Journal of manufacturing systems 46, 13-28, 2018
612018
Current trends analysis and prioritization of success factors: a systematic literature review of ICT projects
M Ayat, M Imran, A Ullah, CW Kang
International journal of managing projects in business 14 (3), 652-679, 2021
552021
Improving project budget estimation accuracy and precision by analyzing reserves for both identified and unidentified risks
H Kwon, CW Kang
Project Management Journal 50 (1), 86-100, 2019
502019
An analysis of the M/G/1 system with N and T policy
S Hur, J Kim, C Kang
Applied Mathematical Modelling 27 (8), 665-675, 2003
492003
Effects of the COVID-19 pandemic on the construction sector: A systemized review
M Ayat, CW Kang
Engineering, construction and architectural management 30 (2), 734-754, 2021
482021
Degradation analysis of nano-contamination in plasma display panels
SJ Bae, SJ Kim, MS Kim, BJ Lee, CW Kang
IEEE Transactions on Reliability 57 (2), 222-229, 2008
462008
Impact of random defective rate on lot size focusing work-in-process inventory in manufacturing system
CW Kang, M Ullah, B Sarkar, I Hussain, R Akhtar
International Journal of Production Research 55 (6), 1748-1766, 2017
452017
Optimum ordering policy for an imperfect single-stage manufacturing system with safety stock and planned backorder
CW Kang, M Ullah, B Sarkar
The International Journal of Advanced Manufacturing Technology 95, 109-120, 2018
322018
Effect of rework, rejects and inspection on lot size with work-in-process inventory
M Ullah, CW Kang
International Journal of Production Research 52 (8), 2448-2460, 2014
322014
Application of artificial neural network to identify non-random variation patterns on the run chart in automotive assembly process
KY Jang, K Yang, C Kang
International Journal of Production Research 41 (6), 1239-1254, 2003
312003
Stochastic-petri net modeling and optimization for outdoor patients in building sustainable healthcare system considering staff absenteeism
CW Kang, M Imran, M Omair, W Ahmed, M Ullah, B Sarkar
Mathematics 7 (6), 499, 2019
282019
A single-stage manufacturing model with imperfect items, inspections, rework, and planned backorders
C Wook Kang, M Ullah, M Sarkar, M Omair, B Sarkar
Mathematics 7 (5), 446, 2019
212019
DEWMA control chart for the coefficient of variation
EP Hong, HW Kang, CW Kang
advanced materials research 201, 1682-1688, 2011
162011
The system can't perform the operation now. Try again later.
Articles 1–20