Stefano Lauria
Title
Cited by
Cited by
Year
Power system planning under uncertainty conditions. Criteria for transmission network flexibility evaluation
P Bresesti, A Capasso, MC Falvo, S Lauria
2003 IEEE Bologna Power Tech Conference Proceedings, 2, 6 pp. Vol. 2, 2003
492003
Modelling and Computer Simulation of Dispersed Generation in Distribution Networks. Measures to prevent disconnection during system disturbances
FM Gatta, F Iliceto, S Lauria, P Masato
2003 IEEE Bologna Power Tech Conference Proceedings, 3, 10 pp. Vol. 3, 2003
492003
Backflashover simulation of HV transmission lines with concentrated tower grounding
FM Gatta, A Geri, S Lauria
Electric Power Systems Research 73 (3), 373-381, 2005
402005
Ground fault temporary overvoltages in MV networks: Evaluation and experimental tests
A Cerretti, FM Gatta, A Geri, S Lauria, M Maccioni, G Valtorta
IEEE Transactions on Power Delivery 27 (3), 1592-1600, 2012
352012
Shunt compensation of EHV cables and mixed overhead-cable lines
S Lauria, FM Gatta, L Colla
2007 IEEE Lausanne Power Tech, 1344-1349, 2007
312007
Analytical prediction of abnormal temporary overvoltages due to ground faults in MV networks
FM Gatta, A Geri, S Lauria, M Maccioni
Electric power systems research 77 (10), 1305-1313, 2007
302007
A new methodology for power systems flexibility evaluation
A Capasso, MC Falvo, R Lamedica, S Lauria, S Scalcino
2005 IEEE Russia Power Tech, 1-6, 2005
302005
Very long EHV cables and mixed overhead-cable lines. Steady-state operation
FM Gatta, S Lauria
2005 IEEE Russia Power Tech, 1-7, 2005
302005
Battery energy storage efficiency calculation including auxiliary losses: Technology comparison and operating strategies
FM Gatta, A Geri, S Lauria, M Maccioni, F Palone
2015 IEEE Eindhoven PowerTech, 1-6, 2015
292015
Optimal operation of long inhomogeneous ac cable lines: the Malta–Sicily interconnector
S Lauria, F Palone
IEEE transactions on power delivery 29 (3), 1036-1044, 2013
292013
Steady-state operating conditions of very long EHVAC cable lines
FM Gatta, A Geri, S Lauria, M Maccioni
Electric power systems research 81 (7), 1525-1533, 2011
292011
Application of a LiFePO4 battery energy storage system to primary frequency control: Simulations and experimental results
FM Gatta, A Geri, R Lamedica, S Lauria, M Maccioni, F Palone, ...
Energies 9 (11), 887, 2016
262016
Steady-state operation of very long EHV AC cable lines
L Colla, FM Gatta, A Geri, S Lauria, M Maccioni
2009 IEEE Bucharest PowerTech, 1-8, 2009
262009
Generalized pi-circuit tower grounding model for direct lightning response simulation
FM Gatta, A Geri, S Lauria, M Maccioni
Electric Power Systems Research 116, 330-337, 2014
222014
Temporary overvoltages due to ground faults in MV networks
A Cerretti, FM Gatta, A Geri, S Lauria, M Maccioni, G Valtorta
2009 IEEE Bucharest PowerTech, 1-8, 2009
222009
Temporary overvoltages due to harmonic resonance in long EHV cables
L Colla, S Lauria, FM Gatta
Int. Conf. Power Syst. Transients, 4-7, 2007
222007
An ATP-EMTP Monte Carlo procedure for backflashover rate evaluation: A comparison with the CIGRE method
FM Gatta, A Geri, S Lauria, M Maccioni, A Santarpia
Electric Power Systems Research 113, 134-140, 2014
212014
Operating envelopes of the Malta-Sicily 245 KV-50 HZ cable
S Lauria, F Palone
2012 IEEE International Energy Conference and Exhibition (ENERGYCON), 287-292, 2012
202012
Simplified HV tower grounding system model for backflashover simulation
FM Gatta, A Geri, S Lauria, M Maccioni
Electric power systems research 85, 16-23, 2012
202012
Steady-state operating conditions of very long EHVAC cable lines: Two case studies
FM Gatta, A Geri, S Lauria, M Maccioni
electric power systems research 83 (1), 160-169, 2012
202012
The system can't perform the operation now. Try again later.
Articles 1–20