Follow
Leena Prasher
Leena Prasher
Chandigarh Group of Colleges,Jhanjeri
Verified email at cgc.ac.in
Title
Cited by
Cited by
Year
A centralized reverse channel structure with flexible manufacturing under the stock out situation
S Singh, L Prasher, N Saxena
International Journal of Industrial Engineering Computations 4 (4), 559-570, 2013
262013
A production inventory model with flexible manufacturing, random machine breakdown and stochastic repair time
S Singh, L Prasher
International Journal of Industrial Engineering Computations 5 (4), 575-588, 2014
192014
Optimal strategy for an inventory model based on agile manufacturing under imperfect production process
H Dem, SR Singh, L Parasher
International Journal of Mathematics in Operational Research 14 (1), 106-122, 2019
152019
Imperfect Production System under Reverse Logistics in Stock-Out Situation: EPQ Model.
H Dem, L Prasher
Advances in Decision Sciences 2013, 2013
82013
Optimal production policies for reverse logistic model under time value of money
L Prasher, SR Singh
International Journal of Operational Research 29 (4), 531-552, 2017
42017
Replenishment model for deteriorating items with price dependent demand and complete backlogging in two storage facilities under the effect of inflation
R Jindal, L Prasher, DS Pathania
Malaya Journal of Matematik 9 (01), 26-32, 2021
12021
Optimizing production policies for flexible manufacturing system with non-linear holding cost
L Prasher, S Pundir
Prestige International Journal of Management & IT-Sanchayan 2 (1), 114, 2013
12013
Optimization Policies for Inventory Model with Deterministic Demand Based on Selling Price and Promotional Efforts Under Inflationary Conditions
R Jindal, AK Padhihari, L Prasher
International Journal of Integrative Sciences 1 (1), 45-56, 2022
2022
An Economic Production Quantity Model with Flexible Production Involving Exponential and Marketing Efforts Dependent Demand
MR Jindal, S Ahmed, L Prasher
Solid State Technology 63 (5), 6287-6309, 2020
2020
Research Article Imperfect Production System under Reverse Logistics in Stock-Out Situation: EPQ Model
H Dem, L Prasher
2013
Optimizing Production Policies for Flexible Manufacturing system with Returnable Items
L PRASHER
Banasthali, 0
The system can't perform the operation now. Try again later.
Articles 1–11